We built the sewage treatment plant of the third basin near the city of Bahia Blanca
This work services a population of 57,000 users
7,300 m3
Earthworks
1,005 m3
Concrete
93 ton
Volume of steel
PROJECT
Third basin sewage treatment plant, Bahía Blanca
Province of Buenos Aires
CLIENT
Aguas Bonaerenses S.A. (ABSA)
DESCRIPTION OF WORKS
Construction of a sewage treatment plant near the city of Bahía Blanca located on an area of 800 m to the southwest on kilometer 696 of National Road 3.
Liquids treated for the new plant are driven by a collector channel –also constructed as part of this contract- to its final destination, the Arroyo Saladillo de García which discharges into the estuary of Bahía Blanca.
The installations included the following structures: pumping station equipped with three submersible vertical centrifugal single stage pumps, desander, equipartidora camera, two aerobic reactors with blowing rooms, sand drying, two secondary clarifiers, mud drier, contact chamber with corresponding chlorination building, auxiliary facilities (workshop, laboratory, command room). Internal, communications, peripheral wall and power lines of 13.2 kV.
LOCATION
Get a Quote
Looking for the best rates on your car loan? Outgrid has you covered! Our seamless quote process makes it easier than ever to secure the financing you need for your dream car.